Project Description

BP4 (also known as 25 Churchill Place), Canary Wharf is to be the new office headquarters of the European Medicines Agency.
The building stands at approximately 130m with 23 floors, including 19 floors of Grade A office space and incorporating four atria on the western elevation.

25 Churchill Place will be one of the most environment-friendly buildings at Canary Wharf to date. Environmental features will deliver an expected ‘excellent’ BREEAM environment performance rating and an Energy Performance Certificate (EPC) rating of 40 or better. Features include the latest ultra-efficient air-conditioning equipment that recycles the energy from exhaust air and photo voltaic cells to generate energy from the sun’s rays.

Services Provided To:

Image result for seele logo

Two Survey Teams
     to execute survey works on this technically-challenging structure

Our duties involved:

  • Performing complex calculations to design discrepancy for angled atria
  • Attending meetings on behalf of contractor to discuss technical survey issues
  • Setting-Out base points on concrete slab and steel for bracket installation.
  • Transference of datum to each level.
  • As-Built Surveys of concrete and steel structures.
  • Monitoring bracket and panel position.